Monday, December 11, 2017

La Paz to Galapagos: Day 2

Today was a work day for the crew on Sea Rover. After a quick breakfast we tore the Hydrovane off the back and stripped it down into many pieces to get it working. An easy but time consuming fix. While the captain was working on that, crew patched the dinghy, ran some wires and prepared for start of the passage. The captain also dove the boat and then went up the rig to do a rig check and repair the lazy jacks. There was talk of using the bosuns chair to pull him out of the water and go right up the rig. We had hoped to also attach the swim ladder but no, the north winds had other ideas about doing work on the swim step. The day ended on a high note with a large cruiser get together on Distant Drummer. It was fun to see so many new faces arriving in to sea from far away places.
Tomorrow is the start of the real offshore work. We hope to arrive in Socorro in about 3 days.
For those keeping score... Gary won the day. Im sure Sea Rover will throw better curve balls at us tomorrow.

----------
radio email processed by SailMail
for information see: http://www.sailmail.com

No comments:

Post a Comment